All Technical articles
View all stories of the same content type.
-
Technical
Does the key to cutting carbon lie beneath your feet?
A new system aims to reduce the embodied carbon of a floor slab by up to 75%. But are other solutions already to hand?
-
Technical
Technical Study: The Black & White Building by Waugh Thistleton
The Office Group’s first new-build project will be London’s tallest timber office building when it completes next year. And as for the reduction in embodied carbon compared with concrete – well, the numbers speak for themselves. Thomas Lane reports
-
Technical
Technical Study: Restoring Birmingham Selfridges’ cladding
Future Systems’ Selfridges has donned temporary garb of greater gaudiness while faults are fixed in the glittering blue chainmail below. Thomas Lane explains the technical challenges. Photography by Oliver Lane
-
Technical
Technical Study: Kingston Cycle Hub, Sarah Wigglesworth Architects
Kingston council has spent £32m upgrading the borough’s cycle facilities, including a storage hub beside the station that is no ordinary bike shed, finds Thomas Lane
-
Technical
Antarctica: Designing for the planet’s most hostile continent
A £100m Antarctic infrastructure programme presents some unique design challenges – like deflecting snow and elephant seals. Elizabeth Hopkirk hears about the hardships and rewards of building at the bottom of the world
-
Technical
One Triton Square by Arup: a refurbishment with a difference
A 20-year old office block increased its net area by 57% but still saved 40,000 tonnes of carbon. How did the project team do it?
-
Technical
Let’s be honest, achieving true net-zero is still a huge challenge
Even with a highly motivated team, RIBA’s 2030 target is little more than an aspiration with less than a decade to go, as Robin Turner demonstrates with this live project
-
Technical
Technical: Neue Nationalgalerie in Berlin, restored by David Chipperfield Architects
‘Surgical’ €100m, decade-long project had to tackle flaws in Mies’ original design
-
Technical
Technical Study: Park Crescent, Regent’s Park, by PDP London
Amanda Birch talks to the architects who demolished and rebuilt a grade I-listed Nash crescent – for a second time
-
Technical
Technical Study: Old Admiralty Building, London by BDP
After a £60m refurb, the top-secret former haunt of Churchill and Ian Fleming is back in Her Majesty’s Service, writes Elizabeth Hopkirk
-
Technical
‘You don’t get involved in a project like this for the glory or the money’
Keppie was working on an extension at Glasgow’s SEC events centre when the brief changed dramatically. Elizabeth Hopkirk hears from the architects
-
Technical
NHS Nightingale: How we built a hospital in 10 days
As the first patients arrive at London’s coronavirus surge hospital, BDP’s James Hepburn tells Elizabeth Hopkirk how they designed it
-
Technical
Coming soon – 3D printed components for the masses
3D printing has the potential to produce complex structural components quickly and cheaply if the technology were commercially available. Now Fosters has done just that.
-
Technical
Technical Study: UK Hydrographic Office in Somerset by AHR
Bringing everything under one roof was a central aim – so the architect made it the defining feature, writes Helena Russell
-
Technical
Technical Study: Stratford Pavilion by Acme
This substantial structure at the Olympic Park had to be built over a DLR tunnel, setting the team major challenges. Ike Ijeh reports
-
Technical
Technical Study: Science Museum supporters’ centre, by Hat Projects
The conversion of a former Royal Mail sorting office into the £3.5m Smith Centre required instinct and guts, writes Elizabeth Hopkirk
-
Technical
Technical Study: Beaconsfield Mews cohousing, London, by Stolon Studio
Architect-developers Robert and Jessica Barker tell Elizabeth Hopkirk how they are turning community-building on backland sites into a business model
-
Technical
Technical Study: North West Cambridge housing by Stanton Williams
The architect’s first affordable housing creates a sense of intimacy while complying with tough daylight regulations, writes Elizabeth Hopkirk
-
Technical
Technical Study: IOC Headquarters, Lausanne, by 3XN
The International Olympic Committee has raised the bar for office buildings. Ike Ijeh finds out how architect 3XN created a world-beater
-
Technical
Technical Study: Hill House, Helensburgh, by Carmody Groarke
Ike Ijeh explains how a chainmail shed is protecting a Charles Rennie Mackintosh mansion from water ingress